Step 04 of 05 — Run it live

Install it

The change is introduced inside the live operation. We work through the first failures, adjust the design where reality disagrees with the plan and support the team until the new way becomes the normal way.

What this step produces

A functioning operating condition that has been tested under real demand, real variability and real shift conditions.

The five steps

Start here

Bring us the bottleneck.

Throughput. Material flow. Warehouse congestion. Planning. Quality. Systems. Capacity. Start with the part of the operation that is not holding.

TvaṣṭṛOps — Implementation EngineeringDiagnose · Engineer · Install · Hand over