Step 02 of 05 — Design the change

Engineer it

The solution is designed against the actual constraint. Capacity, layout, labor, process logic, systems, equipment and failure modes are worked through before implementation begins.

What this step produces

A future-state design with clear operating logic, implementation requirements and measurable targets.

The five steps

Start here

Bring us the bottleneck.

Throughput. Material flow. Warehouse congestion. Planning. Quality. Systems. Capacity. Start with the part of the operation that is not holding.

TvaṣṭṛOps — Implementation EngineeringDiagnose · Engineer · Install · Hand over