Step 05 of 05 — Make the operation self-sustaining

Hand over the controls

Ownership, measures, escalation paths, tuning rules and documentation are transferred to the team that will run the operation. The goal is not dependency — it is control.

Start here

Bring us the bottleneck.

Throughput. Material flow. Warehouse congestion. Planning. Quality. Systems. Capacity. Start with the part of the operation that is not holding.

TvaṣṭṛOps — Implementation EngineeringDiagnose · Engineer · Install · Hand over